COGENERATION CHANNEL
en
COGENERATION CHANNEL
en
              • topics
                • Associations
                • Market and policy
                • Case History
                • Renewable gases
                • Energy efficiency and cogeneration
                • Applications
                • Beyond the plant
                    • events

                      Follow us on

                      netzerotube
                      • English
                      • Italiano
                      • Home
                      • Industry and tertiary sector
                      Fill 29
                      9.9.2019

                      Medical innovation and process efficiency. LivaNova’s pillars

                      Industry and tertiary sector
                      LivaNova is an American multinational company operating in the medical devices field. Its largest plant is located in Mirandola (Italy), where blood oxygenation solutions are developed and produced. The plant is fully verticalized, meaning that it works from the raw materials to arrive at the finished product and therefore the consumption of electricity, as well as of other resources, is high. The plant in fact needs hot and cold water, as well as steam. The optimal solution for a more efficient production is therefore a trigeneration system. A 2 MW plant supplies electricity for molding and clean rooms, cold water and hot water for the heating system, as well as steam for humidification and sterilization. From an environmental point of view, this plant saves around 4,000 t/year of CO2, with a 3-year ROI for the company.
                      Original language: Italian
                      Origin: Italy

                      Speaker

                      Luca Scalmana

                      Next videos

                      02:13
                      12.23.2024

                      The role of cogeneration in the decarbonisation of the construction and industrial sectors

                      Anna Pavlova
                      01:20
                      11.13.2024

                      Cogeneration plant at the Morristown Medical Centre: energy resilience and cost savings for the hospital

                      Patrick Burke
                      01:47
                      4.4.2024

                      Decarbonisation of the industrial and commercial sectors: Renew’s "energy as a service" model

                      Emily Robertson
                      01:13
                      2.13.2024

                      CHP for the Loudoun County Data Centre Alley

                      Buddy Rizer

                      Published by
                      
AB Group

                      AB Energy
                      Via Caduti del Lavoro, 13
                      Orzinuovi (BS)
                      Italy

                      Follow us on

                      Privacy Policy/Cookie Policy
                      © 2024 AB ENERGY SPA Tutti i diritti riservati | P.IVA 02106060987 | REA 417582 | Reg. imp. BS02106060987