COGENERATION CHANNEL
en
COGENERATION CHANNEL
en
          • topics
            • Associations
            • Market and policy
            • Case History
            • Renewable gases
            • Energy efficiency and cogeneration
            • Applications
            • Beyond the plant
            • events

                  Follow us on

                  netzerotube
                  • English
                  • Italiano
                  • Home
                  • Market and policy
                  Fill 29
                  5.18.2017

                  Air quality authorization procedure for cogeneration plants in the USA

                  Market and policy
                  The steps needed to obtain air quality permits for a plant in the USA are: define the project, complete the air quality authorization form and review the documentation together with the relevant agency. The procedure is fairly rapid in the case of cogeneration plants, since these are efficient installations that reduce CO2 emissions into the atmosphere and use gas instead of coal. In general, a good knowledge of the project and good communication between the parties involved will ensure that the permits are obtained.
                  Original language: English
                  Origin: USA

                  Speaker

                  Brian Petermann

                  Next videos

                  02:56
                  2.19.2026

                  Cogeneration in Romania between new investments and emerging challenges

                  Mihai David
                  03:25
                  2.16.2026

                  The future of cogeneration in Europe: A new study on the way

                  Alexandra Tudoroiu-Lakavičė
                  01:29
                  1.9.2026

                  Italy - Cogeneration and the Energy Efficiency Directive: New limits and Italcogen’s proposals

                  Alessandro Borin
                  01:32
                  1.7.2026

                  Cogeneration in the U.S. Southeast

                  Isaac Panzarella

                  Published by
                  
AB Group

                  AB Energy
                  Via Caduti del Lavoro, 13
                  Orzinuovi (BS)
                  Italy

                  Follow us on

                  Privacy Policy/Cookie Policy
                  © 2026 AB ENERGY SPA Tutti i diritti riservati | P.IVA 02106060987 | REA 417582 | Reg. imp. BS02106060987