                      Cimaco cogeneration plant: why is the project feasible?

                      Financing
                      The Cimaco Group is a historic Mexican company that operates a shopping center in the Torreon area. To address the need of increasing the efficiency of its energy use and to be more competitive on the market, Cimaco has put together an Energy Committee, which chose cogeneration technology to achieve these goals. The project was approved by the Committee and financed by the credit institution as the ROI was satisfactory and it was determined that the costs of the project would not affect the company’s normal performance.
                      Original language: Spanish
                      Origin: Mexico

                      Speaker

                      Gustavo Navejas

                      Next videos

                      02:19
                      12.12.2022

                      EIT InnoEnergy, the European energy startup accelerator

                      Sofia Lettenbichler
                      04:04
                      11.8.2022

                      EEEF, the European fund for financing energy efficiency projects

                      Paola Rusconi
                      01:54
                      7.8.2022

                      How to obtain benefits from a cogeneration plant purchased from an ESCo

                      Łukasz Feldman
                      02:14
                      2.26.2020

                      Installing a cogeneration plant based on a leasing model

                      Rodrigo Niño

                      Published by
                      
AB Group

                      AB Energy
                      Via Caduti del Lavoro, 13
                      Orzinuovi (BS)
                      Italy

                      Follow us on

                      Privacy Policy/Cookie Policy
                      © 2025 AB ENERGY SPA Tutti i diritti riservati | P.IVA 02106060987 | REA 417582 | Reg. imp. BS02106060987