7.30.2019
Gorge Farm Project: the first biogas plant in Africa to be connected to the grid
Associations
Gorge Farm is the location of one of the largest biogas plants in East Africa. The farm, which covers more than 800 hectares, feeds the plant with agricultural waste, straw and organic matter. The plant’s power output is 2.4 MW, with the electricity produced being fed into the grid or reused on the farm itself. Walter Danner, who was involved in building the project, tells us more.
Original language: English
Origin: Germany
Speaker
Walter Danner
CEO, Snowleopard projects
Next videos
02:45

4.24.2025
Biogas and Biomethane: how to manage 2025 regulatory obligations with support from CIB Service
Emanuele Cremascoli
03:51

4.8.2025
Gasification as a key to a low-emission energy future in Europe
Anastasiya Agapova
01:19

3.27.2025
Prandini at Biogas Italy: less bureaucracy and more awareness for biogas and biomethane
Ettore Prandini
00:50

3.20.2025
Next edition of the EBA Conference announced – October 14-15, Autoworld, Brussels
Harmen Dekker