11.18.2014
Optimisation of energy costs in hospital facilities. The example of Vivantes
Industry and tertiary sector
Vivantes, one of the main hospital networks in Germany, has decided to use cogeneration as a tool to optimise hospital energy costs. The energy manager tells us here how the hospital network, which requires 64 GWh per year, has chosen to install six cogeneration plants at four sites in Germany.
Original language: German
Origin: Germany
Speaker
Clemens Schreiber
Next videos
01:13
2.13.2024
CHP for the Loudoun County Data Centre Alley
Buddy Rizer
01:59
1.11.2024
CCHP for Colorado State University: towards carbon neutrality by 2030 thanks to trigeneration/CCHP from renewable sources
Derek Young
03:31
12.21.2023
Data centre resilience and reliability thanks to CHP in microgrids
Charles Miller
01:15
10.18.2023
Transports Metropolitans de Barcelona focuses on biomethane to power the trigeneration plant
Josep Ariño