COGENERATION CHANNEL
en
COGENERATION CHANNEL
en
              • topics
                • Associations
                • Market and policy
                • Case History
                • Renewable gases
                • Energy efficiency and cogeneration
                • Applications
                • Beyond the plant
                    • events

                      Follow us on

                      netzerotube
                      • English
                      • Italiano
                      • Home
                      • Case history
                      Fill 29
                      7.27.2022

                      Poland: 2.7 MW cogeneration plant illuminates a 4-hectare greenhouse

                      Case history

                      Grupa Producentów Rozsad Krasoń is one of the largest greenhouse seedling producers, with three production sites in Poland and exports throughout Europe. In order to meet the growing energy needs of the 4-hectare greenhouse located in Kisiele, the company has decided to install a 2.7 MW cogeneration plant. The plant, flanked by a storage system, guarantees a constant supply of electricity for greenhouse lighting, as well as for heat. Grupa Producentów Rozsad Krasoń has also chosen cogeneration in other locations and a second plant will soon join the existing one at the Kisiele site, as plans are underway to expand the greenhouse.

                      Original language: Polish
                      Origin: Poland

                      Speaker

                      Artur Jędrych
                      Technical Director, Grupa Producentów Rozsad Krasoń

                      Next videos

                      03:10
                      11.24.2023

                      Meeting the energy needs of an automotive company with a trigeneration plant: the BWI Group case

                      Aneta Kwiatkowska,Jerzy Chuchro,
                      05:26
                      6.22.2023

                      Waterproofing systems produced in a sustainable way. The Polyglass-Mapei experience

                      Simonetta Rossi,Stefano Galbiati,Roberto Stellino,
                      03:31
                      12.20.2022

                      Fondazione Poliambulanza 5 years later - Results above expectations

                      Jorge Federico Galluzzi ,Alessandro Triboldi,
                      04:18
                      12.1.2022

                      Trigeneration in the energy efficiency plan for Zoetis’ carbon neutrality

                      Vincenzo Iudicelli,Federica Navarra,

                      Published by
                      
AB Group

                      AB Energy
                      Via Caduti del Lavoro, 13
                      Orzinuovi (BS)
                      Italy

                      Follow us on

                      Privacy Policy/Cookie Policy
                      © 2024 AB ENERGY SPA Tutti i diritti riservati | P.IVA 02106060987 | REA 417582 | Reg. imp. BS02106060987