COGENERATION CHANNEL
en
COGENERATION CHANNEL
en
              • topics
                • Associations
                • Market and policy
                • Case History
                • Renewable gases
                • Energy efficiency and cogeneration
                • Applications
                • Beyond the plant
                • events

                  Follow us on

                  netzerotube
                  • English
                  • Italiano
                  • Home
                  • Case history
                  Fill 29
                  7.27.2022

                  Poland: 2.7 MW cogeneration plant illuminates a 4-hectare greenhouse

                  Case history

                  Grupa Producentów Rozsad Krasoń is one of the largest greenhouse seedling producers, with three production sites in Poland and exports throughout Europe. In order to meet the growing energy needs of the 4-hectare greenhouse located in Kisiele, the company has decided to install a 2.7 MW cogeneration plant. The plant, flanked by a storage system, guarantees a constant supply of electricity for greenhouse lighting, as well as for heat. Grupa Producentów Rozsad Krasoń has also chosen cogeneration in other locations and a second plant will soon join the existing one at the Kisiele site, as plans are underway to expand the greenhouse.

                  Original language: Polish
                  Origin: Poland

                  Speaker

                  Artur Jędrych
                  Technical Director, Grupa Producentów Rozsad Krasoń

                  Next videos

                  03:10
                  11.24.2023

                  Meeting the energy needs of an automotive company with a trigeneration plant: the BWI Group case

                  Aneta Kwiatkowska,Jerzy Chuchro,
                  05:26
                  6.22.2023

                  Waterproofing systems produced in a sustainable way. The Polyglass-Mapei experience

                  Simonetta Rossi,Stefano Galbiati,Roberto Stellino,
                  03:31
                  12.20.2022

                  Fondazione Poliambulanza 5 years later - Results above expectations

                  Jorge Federico Galluzzi ,Alessandro Triboldi,
                  04:18
                  12.1.2022

                  Trigeneration in the energy efficiency plan for Zoetis’ carbon neutrality

                  Vincenzo Iudicelli,Federica Navarra,

                  Published by
                  
AB Group

                  AB Energy
                  Via Caduti del Lavoro, 13
                  Orzinuovi (BS)
                  Italy

                  Follow us on

                  Privacy Policy/Cookie Policy
                  © 2022 AB ENERGY SPA Tutti i diritti riservati | P.IVA 02106060987 | REA 417582 | Reg. imp. BS02106060987