1.18.2015
Vinavil on the front line for an efficient chemical industry
Case history
How does Vinavil produce the energy required to power the Verbania plant? In this Case Study Mr Stecconi, the company’s technical manager, describes the particular uses of the electrical and thermal energy produced by the 1.415 MWe cogeneration plant that was installed in 2010 and highlights the many advantages derived from this choice.
Original language: English
Origin: Italy
Speaker
Patrizio Stecconi
Next videos
04:30

4.2.2025
Cogeneration for oilseed processing: The Ital Green Oil (Cereal Docks) case
Carlo Stopazzola,Salvatore Fadda,
05:55

1.14.2025
Alpla – Plasco redefines plastic production by focusing on energy efficiency
Tiziano Andreini,Marco Panici,
03:10

11.24.2023
Meeting the energy needs of an automotive company with a trigeneration plant: the BWI Group case
Aneta Kwiatkowska,Jerzy Chuchro,
05:26

6.22.2023
Waterproofing systems produced in a sustainable way. The Polyglass-Mapei experience
Simonetta Rossi,Stefano Galbiati,Roberto Stellino,