12.23.2015
A 4MW low-cost installation: the secret is in the digester
Case history
An innovative 4MW installation, located in Germany, allows the production of electricity, heat and biomethane with a limited investment, low energy consumption and maintenance. We entered inside the underground digester, to discover how the matrices from agricultural sources are moved without the help of mechanical stirrers but simply through an upward drive mechanism for by-products.
Original language: German
Origin: Germany
Speaker
Xaver Macht
CEO, Grüngas GmbH
Next videos
03:08

10.27.2023
Excellent performance for cogeneration engines – including those powered by biomethane - thanks to MOTUL OIL
Guido Garbarino,Simone Rivaroli,
04:10

9.28.2023
For the last stage of the Farming Tour, focus on digestate and minimum processing techniques
CIB (Consorzio Italiano Biogas)
03:27

6.30.2023
The third stage of the Farming Tour arrives for the first time in Friuli-Venezia Giulia at the Azienda Agricola Principi di Porcìa e Brugnera
CIB (Consorzio Italiano Biogas)
04:03

5.10.2023
The FarmingTour organised by the CIB returns: first appointment in Piedmont, at the Cooperativa Speranza
CIB (Consorzio Italiano Biogas) ,Serena Vanzetti,