11.13.2023
Aspects to consider and most common errors in the design of a biomethane plant
Applications and technologies
The first thing to do before undertaking a biomethane project is a feasibility study. This evaluates investments, technologies and results related to the project. But what else needs to be evaluated? And what are the most frequent errors in the design phase? Let’s find out in this interview.
Original language: English
Origin: Poland
Speaker
Jan Claus
Head of Public Relations, GICON® Großmann Ingenieur Consult GmbH
Next videos
03:16

12.18.2025
From land to energy: the story of Agribioenergia
Enrico Dall'Olio
02:04

12.17.2025
Biogas and biomethane in Brazil: a story of a challenge
Pierre-Emmanuel Moussafir
03:38

12.9.2025
How membranes are made: excellence and innovation at UBE’s Sakai facility
Satoshi Kawamura
02:52

12.2.2025
Life Chandelier: biomethane from the countryside
Paz Gómez
