11.13.2023
Aspects to consider and most common errors in the design of a biomethane plant
Applications and technologies
The first thing to do before undertaking a biomethane project is a feasibility study. This evaluates investments, technologies and results related to the project. But what else needs to be evaluated? And what are the most frequent errors in the design phase? Let’s find out in this interview.
Original language: English
Origin: Poland
Speaker
Jan Claus
Head of Public Relations, GICON® Großmann Ingenieur Consult GmbH
Next videos
01:40

1.5.2026
Synergies between biomethane and green hydrogen: the TES-IDEG project
Buenaventura Gómez
01:12

12.31.2025
The potential of olive pomace for biomethane production in Spain
Juan Manuel Medel
02:33

12.29.2025
Biomethane as a driver of green logistics in Brazil
Vanessa Pilz
03:16

12.18.2025
From land to energy: the story of Agribioenergia
Enrico Dall'Olio
