11.13.2023
Aspects to consider and most common errors in the design of a biomethane plant
Applications and technologies
The first thing to do before undertaking a biomethane project is a feasibility study. This evaluates investments, technologies and results related to the project. But what else needs to be evaluated? And what are the most frequent errors in the design phase? Let’s find out in this interview.
Original language: English
Origin: Poland
Speaker
Jan Claus
Head of Public Relations, GICON® Großmann Ingenieur Consult GmbH
Next videos
02:43

8.21.2026
Optimising AD feedstocks: building efficient and sustainable plants
Iria Nicholas
01:48

8.20.2026
Biomethane infrastructure: finding the right path to grid injection
John Baldwin
01:49

8.3.2026
Bio-LNG and the future of Maritime Decarbonisation
Christopher Maloney
01:32

7.7.2026
PSA for biomethane from landfill gas: a flexible solution for methane recovery
Arturo Di Fraia
