10.28.2020
Biomethane/RNG injection skid into the grid
Applications and technologies
There are several aspects to consider in order to ensure the safety and quality of biomethane/RNG before injecting it into the national gas network. An injection skid is needed, in other words a set of equipment including gas chromatographs for accurate online analysis, metres for fiscal measurement, pressure control equipment and odorising systems. What are the advantages of a skid? Find out in this video.
Original language: Italian
Origin: Italy
Speaker
Nicola Ducani
Key Account Sales Manager, EMERSON
Next videos
02:43

8.21.2026
Optimising AD feedstocks: building efficient and sustainable plants
Iria Nicholas
01:48

8.20.2026
Biomethane infrastructure: finding the right path to grid injection
John Baldwin
01:49

8.3.2026
Bio-LNG and the future of Maritime Decarbonisation
Christopher Maloney
01:32

7.7.2026
PSA for biomethane from landfill gas: a flexible solution for methane recovery
Arturo Di Fraia
