10.20.2016
Brazil: a 29.5MW landfill biogas plant, one of the biggest in the world
Case history
The plant is located in Caieiras, São Paulo. 21 modules, 8,000 tons of waste treated a day, and an installed capacity of 29.5MW to supply electricity to a city of 300,000 inhabitants. Part of the energy produced is used by the plant, and the remaining part is sold to the grid. The project, baked by Solvì - a leading company in ecological waste treatment - considering the success of the Minas do Leão plant, was unveiled at COP21 Paris 2015. The plant meets the targets of Brazil’s Solid Waste Policy and allows for considerable reductions in CO2 emissions.
Original language: English
Origin: Brazil
Speaker
Carlos Alberto Bezerra
Director of Termoverde Caieiras
Next videos
03:59

12.10.2024
Efficiency and sustainability: the role of Shell Mysella S6 SM in the Azienda Agricola Salera
Fabio Corna,Alessia Sonzogni ,Alessandro Richelmi,
03:02

10.16.2024
Romania: Genesis Biopartner's new biogas plant from organic waste
Michael Dietrich,Horia-Matei Bardeanu,
03:05

6.25.2024
The Farming Days tour organised by the CIB (Italian Biogas Consortium) starts again from Piedmont. Here's the video of the day
CIB (Consorzio Italiano Biogas)
03:08

10.27.2023
Excellent performance for cogeneration engines – including those powered by biomethane - thanks to MOTUL OIL
Guido Garbarino,Simone Rivaroli,