10.20.2016
Brazil: a 29.5MW landfill biogas plant, one of the biggest in the world
Case history
The plant is located in Caieiras, São Paulo. 21 modules, 8,000 tons of waste treated a day, and an installed capacity of 29.5MW to supply electricity to a city of 300,000 inhabitants. Part of the energy produced is used by the plant, and the remaining part is sold to the grid. The project, baked by Solvì - a leading company in ecological waste treatment - considering the success of the Minas do Leão plant, was unveiled at COP21 Paris 2015. The plant meets the targets of Brazil’s Solid Waste Policy and allows for considerable reductions in CO2 emissions.
Original language: English
Origin: Brazil
Speaker
Carlos Alberto Bezerra
Director of Termoverde Caieiras
Next videos
04:03

5.10.2023
The FarmingTour organised by the CIB returns: first appointment in Piedmont, at the Cooperativa Speranza
CIB (Consorzio Italiano Biogas) ,Serena Vanzetti,
02:28

5.10.2022
Biogas and biomethane in Veneto, protagonists of the second stage of the CIB Farming Tour at the l’Azienda Agricola Ca’ Corniani (Genagricola Group)
Daniele ColombO
03:00

4.5.2022
CIB Farming Tour 2022: first stop in the wonderful Az. Agricola la Falchetta
CIB (Consorzio Italiano Biogas)
03:50

11.14.2021
Quality products, respect for the environment and soil protection thanks to biogas
CIB (Consorzio Italiano Biogas)